Our Professional 9-Step Process

1.Clean and sanitize tub with a poly bond solution

2. acid-etch to remove old finish

3. Sand out any imperfections

4. Tac-cloth and smooth out tub

5. Apply a chemical primer and a ceramic bonding agent.

6. Spray primer coats, as necessary, and allow to dry.

7. Mix a top coat & prepare the tub for a top coat.

8. Spray the tub with a top coat leaving a like-new finish.

9. Allow 24 -72 hours to dry